EN | IT | DE

Cart

Close

No products in the shopping cart.

🧪 ToloMEO Board Farm — Hardware in the loop testing that speeds up quality and releases

ToloMEO Board Farm is the HIL infrastructure that automates testing on real DAVE hardware, cutting release risk and time. The dedicated rack enables controlled power‑cycling, DUT orchestration and functional scenarios under realistic conditions, so every firmware is validated on real boards before OTA rollout.

Key Features

Why Board Farm

  • Real hardware, no surprises – Execute automated power‑cycles and reproducible functional suites on actual DAVE SOM/SBC platforms.
  • DevSecOps‑ready – Hooks into the build & signing pipeline, SBOM/VEX generation, triage and reports; artifacts must pass Board Farm before OTA delivery.
  • Measurable quality – Structured reports and end‑to‑end traceability for each firmware release, aligned with security and compliance processes.
  • Scalable & repeatable – Parallel tests across multiple platforms with build caching and reusable regression/smoke scenarios.
  • Reliable release gate – Only builds that pass Board Farm proceed to signed, verified OTA (delta or full) with automatic rollback.

How it fits your workflow

  1. Build → 2) Signing → 3) SBOM/VEX → 4) Board Farm (HIL) → 5) Test Report → 6) Secure OTA to the field.
    Outcome: faster time‑to‑market, fewer field issues and industrial‑grade reliability from day one.
Get a quote

Get a quote

Fields (*) are required.